All Activity
Launch
Happening
Local Pulse
Nearby
Trending
Premium
Total In: £0.00
Total Out: £0.00
Balance: £0.00
Reporting Currency: £ (GBP)
See what people are noticing right now — in the physical world and across local services. Add an update, search the feed, and narrow it by person, date or place.
Say what you physically saw happening, then choose where you saw it.
Simply explain what is down or having problems. If it is digital/online and not tied to a known place, remove the selected location.
Choose the physical place where you actually saw it. Your normal TXTWRK location is selected automatically.
Leave empty if it is not specifically associated with another TXTWRK user/page.
Advertise an offer, strike a deal, and find what people and places are offering around you.
Your latest most-complete offer is used to prefill address, phone and website next time. Offer photos are stored as compressed JPGs and do not use your Data Balance.
This uses your normal TXTWRK location. Members can signal interest with Thumbs Up; the public count opens the list of profiles who responded.
| Pillar | Proposed outcome | Evidence needed |
|---|---|---|
| Open innovation | British startups can propose and test designs and algorithms | Published contribution process and accepted pilot proposals |
| Modular computing | Complementary processing units work through defined interfaces | Benchmarks of integrated prototypes |
| Practical deployment | Integration pathways into TXTWRK server systems | Server test results and deployment plans |
| Multi-generational design | Systems are repairable and upgradeable instead of routinely discarded | Service procedures, lifetime and environmental assessments |
| British growth | New opportunities for design, software, IP and manufacturing partners | Tracked participation, pilots and commercial contracts |
| Responsibility | Proposed owner or role |
|---|---|
| Roadmap, administration, budget and publication | TXTWRK project management |
| Architecture proposals and standards reviews | Technical working group, initially convened by TXTWRK |
| Startup and university submissions | Open contribution and review process |
| Licensing, confidentiality, patent and attribution policies | Written legal/IP governance, reviewed professionally |
| Security, safety and benchmarking | Designated independent reviewers as project grows |
| Project disputes and major standard changes | Documented decision and appeal process |
| Checklist | Primary scope | GB Chip connection |
|---|---|---|
| GB Chip — Open Project (master) | Standards, architecture, governance, partners, proposals, case studies, lifecycle | Source of shared interface requirements and approved experiments |
| TXTWRK Server Development | Server architecture, integration, procurement, operations, productisation | References GB Chip modules, test environments and deployment dependencies |
| AID / TXTWRK AI | AI requirements, algorithm assessment, optimisation and evaluation | Sends workload needs and benchmark findings into the GB Chip roadmap |
| Horizon | Intended practice | Important qualification |
|---|---|---|
| Initial design | Repairability, modularity, documented standards | Every modular interface involves cost/performance trade-offs |
| Every 5 years | Review standards, introduce optional newer modules and software | Compatibility is a design goal, not an automatic guarantee |
| 10–20+ years | Refurbish suitable systems, replace worn components, recertify | Depends on component support, economics, safety and workload |
| Multi-decade / century-scale | Preserve specifications, knowledge and reusable materials | A long-lived standard is not a claim that individual chips last 100 years |
| Candidate pilot | What to measure |
|---|---|
| AI inference on different compute engines | Cost per task, latency, accuracy, throughput, energy |
| Confidential or security-sensitive workloads | Isolation, auditability, overhead and risk |
| Data processing and streaming | Memory bandwidth, throughput and reliability |
| Server modular upgrade | Downtime, service cost, compatibility and waste avoided |
| Refurbishment and recommissioning | Failure rates, safety checks, cost and lifecycle emissions |
| Phase | Deliverables | Exit criterion |
|---|---|---|
| 0 — Charter | Project identity, scope, ownership, open participation and IP rules | Approved charter and public project page |
| 1 — Requirements | Partner interviews, use cases, interfaces, metrics and server/AID links | Prioritised requirements with named owners |
| 2 — Prototype | Existing-hardware demonstrators and repeatable benchmarks | Evidence of a technically valuable workload pathway |
| 3 — Standard proposal | Draft interfaces, compatibility policy and working-group review | Public feedback and revision process |
| 4 — Commercial pilots | Server integration trials, lifecycle tests, cost and regulatory review | Independent pilot evidence and viable business case |
| Risk | Recommended response |
|---|---|
| Overclaiming an unbuilt product | Clearly label concept, prototypes and validated products separately |
| Fragmented, incompatible contributions | Publish interface rules, versioning, compliance tests and review gates |
| IP disputes or proprietary lock-in | Establish contribution agreements before design sharing |
| High fabrication cost | Validate on existing hardware before custom silicon commitments |
| Security and reliability gaps | Independent reviews, threat modelling and reproducible tests |
| Environmental claims without evidence | Comparative lifecycle assessment and measured energy use |
| Political campaigning deterring technical partners | Separate technical governance and published standards from campaign messaging |

COMMUNITY
People